Skip to content
AUS Building & MAINTENANCE SERVICE

Our projects

Recent work from around Logan and the Brisbane southside — finished jobs and a few shots of what happens before the finishes go on.

Blue waterproofing membrane applied across a bathroom floor and up the walls before tiling
Wet-area waterproofing Work in progress
Close-up of waterproofing membrane in a shower base, showing the floor waste and the sealed wall junction
Shower waterproofing and falls Work in progress
Completed shower tiled floor to ceiling in marble-look large-format tiles with a frameless glass screen
Frameless shower, large-format tiling Completed
Renovated bathroom with marble-look floor and wall tiling, a timber-top vanity and vessel basin
Bathroom renovation Completed
Completed kitchen with white cabinetry, stone benchtop, undermount sink and a textured white tile splashback
Kitchen renovation Completed
Kitchen with a stone breakfast bar, full-height pantry cabinetry and a built-in oven
Breakfast bar and cabinetry Completed
New kitchen cabinetry and benchtop installed, with the original floor tiles still to be removed
Cabinetry installation Work in progress
Kitchen benchtop and sink in place while new timber-look flooring is laid through the adjoining room
Benchtop and new flooring Work in progress
Finished timber flooring in a bedroom with afternoon light falling across the boards
Timber flooring Completed
Wide-board timber-look flooring through an open living area beside a recycled brick feature wall
Timber flooring and feature wall Completed
Spotted gum look vinyl plank flooring running through a hallway and into the adjoining rooms
Vinyl plank flooring Completed
Vinyl plank flooring laid through a living and dining area up to a bay window
Vinyl plank through living areas Completed
Hybrid plank flooring part-laid through a kitchen and hallway, with boards and packaging still on site
Hybrid flooring installation Work in progress
Completed concrete sleeper retaining wall running the length of a timber boundary fence
Concrete sleeper retaining wall Completed
Concrete sleeper retaining wall built along a narrow side yard with galvanised steel posts
Retaining wall, side access Work in progress
Concrete sleeper retaining wall following the perimeter of a backyard, ground prepared for levelling
Retaining wall to yard perimeter Work in progress
Concrete sleeper retaining wall stepping down beside a concrete path, with drainage material behind the wall
Retaining wall along a path Work in progress
Concrete sleeper retaining wall built hard against an existing timber boundary fence
Retaining wall to boundary Work in progress
New green Colorbond boundary fence with a matching double gate, built straight and plumb along a driveway
Colorbond fence and gate Completed
New timber wall framing and roof trusses in place, with electrical and ducted services run through
Structural timber framing Work in progress
Internal walls stripped back to the frame during a renovation, opening a living area up to the rear of the house
Wall removal and reframing Work in progress

Photographs are of our own completed and in-progress work. We are adding more as jobs finish — if you would like to see something specific, just ask.

Want something like this at your place?

Free on-site quotes across Logan and the Brisbane southside.

Call WhatsApp Quote